Grout is a small thing, but this is where water gets in. Joints cleaned to full depth before filling, epoxy grout where floors get wet, a sponge before it sets - and the 5 mm expansion gap at the walls that stops tiles lifting in the heat.
After the tiles are down, the floor's weakest line is the few millimetres between them. Grout done properly protects against all three enemies at once - water, dirt and cracks. Grout done lazily peels out within a season and lets water under the floor.
Two choices decide most of the result. In bathrooms and kitchens, use epoxy grout: it does not absorb water and does not blacken. And at every wall edge, leave a gap of about 5 mm - covered later by the skirting - because tiles expand in heat, and a floor fitted tight to the walls can lift in the middle, a failure called tenting. Large floors also take a joint in the middle every 4-5 m.
Two mistakes that cannot be fixed later
- Grout pressed into a dirty joint: adhesive and dust underneath mean the grout sits on top and flakes out. Remove spacers, rake the joint clean to full depth, then fill.
- No gap at the edges: thermal expansion has nowhere to go, and tiles lift with a bang in summer. Keep the 5 mm perimeter gap under the skirting.
The right sequence, in six steps
- Remove the spacers once the adhesive has dried.
- Clean every joint of adhesive and dust, to full depth.
- Mix the grout - water or hardener exactly per the manufacturer.
- Fill with a rubber float worked at an angle to the joint.
- Wipe the excess with a damp sponge before it sets.
- Let it cure as the manufacturer says, keeping water away.
Numbers worth remembering
- Edge gap: about 5 mm, hidden under the skirting
- Joints on large floors: every 4-5 m
- Wet areas: epoxy grout
- Joint depth: filled fully, never skinned over
- Curing: per the manufacturer, dry
Site checklist
- Spacers out, joints raked clean
- Epoxy used in wet areas; joints filled to depth
- Excess sponged off; perimeter gap left at walls
- No water on the floor until cured
Grout is a small thing, but this is where water gets in. This guide is adapted from BHK99's illustrated site handbook series. It completes the floor begun in laying floor tiles; the stone details that cover the edge gap are in granite, marble and skirting.