Skip to content

Site & quality

Before the tiles: a clean, level, well-prepared floor base

Published 25 November 2026

Site & quality guide from the BHK99 knowledge centre
Site & quality guide from the BHK99 knowledge centre

A tile is only as good as the base beneath it. One finished floor level across the house so no door has a step, slope only where water must run, cracks filled, pipes finished first - the preparation that decides how every tile behaves.

Tiling begins before the first box of tiles is opened - on the base. Under every tile is a stack: the RCC or PCC base, a mortar or adhesive bed, the tile, and the grout joint. If the base is dirty, cracked or at the wrong level, no tile and no labour can save the floor above it.

Two decisions set up everything else. First, fix one finished floor level - FFL - for the whole house, so rooms meet at doors without a stumble. Second, decide where the floor must NOT be level: bathrooms, balconies and the terrace slope towards their drains at about 1:100, while rooms stay perfectly flat.

Two mistakes that cannot be fixed later

  • Tile laid over dust, debris or cracks: the bed never bonds to the base and the tiles loosen early. Sweep, scrape old mortar, fill cracks, and wet the base before work.
  • No level reference: each room ends up at its own height, with steps at the doors and water wandering. Mark a level line one metre above FFL on every room's wall with a water or laser level.

The right sequence, in six steps

  • Clean the base of dust, mortar droppings and oil.
  • Fill cracks and pits with mortar.
  • Mark the one-metre level line in every room.
  • Mark the slope towards the trap in every wet area.
  • Finish all under-floor plumbing and electrical first.
  • Soak the base with water before the bed goes down.

Numbers worth remembering

  • Level line: 1 m above the finished floor level
  • Bathroom slope: about 1:100 towards the trap
  • Traditional mortar bed: about 20-30 mm
  • Adhesive bed: about 3-6 mm, per the manufacturer (IS 15477)
  • Rooms: dead level, no slope

Site checklist

  • Base clean and sound; cracks filled
  • One FFL for the house; level line in every room
  • Slopes marked in wet areas; under-floor services complete
  • Base wetted before laying

A tile is only as good as the base beneath it. This guide is adapted from BHK99's illustrated site handbook series. Choose what goes on this base in choosing tiles room by room, then lay them with the full-bed method.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.