The band above your windows carries the wall over the opening, and the sunshade hangs from it with nothing underneath. One rule saves both: enough bearing for the lintel, and main steel on top of the sunshade - forget that and it will surely droop.

Above every door and window the wall needs a bridge - the lintel - and outside, a sunshade keeps sun and rain off the opening. Both are small castings, and both fail in the same two well-known ways on careless sites: too little bearing, and sunshade steel in the wrong place.

A lintel should sit at least 150 mm into the wall on each side (or as much as its own depth), so the load spreads into the masonry. The sunshade is a cantilever - held from one side only - so the pull is at its top. Its main steel runs near the top surface and bends well back into the lintel. Sunshade steel on top: forget this one thing and the sunshade will surely droop.

Two mistakes that cannot be fixed later

  • Too little lintel bearing: the load concentrates at the corners of the opening, and diagonal cracks run through the bricks. Keep at least 150 mm inside the wall each side.
  • Sunshade steel placed low: in a cantilever the tension is on top; steel placed low does nothing, the sunshade droops and a crack opens at its root. Main steel sits 15-20 mm below the top surface, with an L-bend anchored into the lintel.

The right sequence, in six steps

  • Fit the frame and raise the wall to lintel level.
  • Erect a box for the lintel and a board for the sunshade, props below.
  • Place the lintel cage, with the sunshade's top steel bent into the lintel.
  • Cast the lintel and sunshade together in one go.
  • Cure with wet gunny bags for 7-10 days.
  • Strike the lintel shuttering after 7 days - but sunshade props stay 14 days.

Numbers worth remembering

  • Lintel bearing each side: at least 150 mm
  • Cover on the lintel cage: 25 mm (IS 456, Table 16)
  • Sunshade thickness: about 75-100 mm, as per drawing
  • Sunshade main steel: in the top layer (IS 456, cantilever action)
  • Removing sunshade props: not before 14 days (IS 456, Table 11)

Site checklist

  • Lintel level equal on both sides; bearing at least 150 mm
  • Cover blocks in the cage; sunshade steel on top, bent into the lintel
  • A slight outward slope in the sunshade shuttering so water runs off
  • Cast in one go; props not removed early

This guide is adapted from BHK99's illustrated site handbook series. The next layer of the wall's life is plaster; for the structure these rest on, see RCC beams.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.